Whitstable Installation Time Lapse
14th April 2022
14th April 2022
We recently carried out this wonderfully charming conservatory installation in Whitstable, teaming up with MMS360 for the timelapse.
For this installation, we laid the base before subcontracting Elecsec for the electrical fittings and lighting. We then fitted Deceuninck 2800 windows and doors before plastering the walls. Once plastering was complete, we applied a screed finish on the internal floor.
The finishing touches to this installation saw us fit a Prefix warm roof and guttering to the conservatory.
Don’t just take our word for it.